Project Status
Under Construction
Installed Power
1,121 MWe
Year of Construction
Continues
Annual Generation
1,825 GWh
Location
Amasya - Merkez
Within the framework of Rama Energy Group’s vision for sustainable energy generation, Rama Energy Group will operate the Midilli HEPP Hybrid Solar Power Plant Project-1, which will be established in the central district of Amasya. This solar power plant, with a capacity of 1.1210 MWe, will be integrated into the existing hydroelectric facility and designed as a high-efficiency hybrid system that combines environmental responsibility with resource diversification.
According to current market data, the total projected investment cost for the construction of the plant is approximately 20 to 25 million Turkish Lira. This cost includes solar panels, inverters, mounting structures, connection infrastructure, and electrical equipment.
Considering the average annual sunshine hours in the Amasya region, the annual energy generation of this hybrid solar power plant is estimated to be approximately 1,750,000 to 1,900,000 kWh. This generation capacity is sufficient to meet the annual electricity consumption of around 600 households.
Similar Projects